The short answer
A contract manufacturer quotes setup, run time, material, and outside processing before it has built the part. After the job runs, the actual hours and costs are in the ERP, but they are rarely compared with the quote. Join quotes to completed jobs and compare quoted and actual cost by part family, machine, customer, and quantity. Some families are usually underquoted every time, and the pattern is consistent enough to fix in the estimating model.
Where it hides in contract manufacturing
Setup on short runs
Outside processing
Repeat orders at the old price
Scrap and rework
The records to pull
Twelve to twenty-four months of each. Nothing needs to be installed or connected; a spreadsheet export is enough.
Quotes
Job costing
Sales orders
The ten-day test
Days 1–2
Days 3–5
Days 6–8
Days 9–10
Specimen · illustrative figures
A $45M contract manufacturer matched 6,200 quotes to completed jobs. Overall, actual cost ran 7 percent above quote, but runs under 100 pieces ran 23 percent above, almost all in setup. Forty repeat parts were still shipping at prices more than three years old. Correcting the setup model and repricing repeat parts was worth an estimated $500K to $750K in margin a year.
Stop condition, written first
Stop if actual cost is within five percent of quoted cost across part families and quantities, in both the search period and the holdout.
What gets built if it holds
An estimating model recalibrated from your own job history, with a quarterly repricing check on repeat parts. It runs inside your operation, belongs to you, and is measured weekly against the dollar range the test produced.
Specimen figures are illustrative and do not describe a Modven client. Reviewed October 10, 2026.