ModvenRun an Opportunity ID →

Hunch library · Freight · Packaging distribution

Freight recovery in packaging distribution

“Freight is built into our pricing. We don’t lose money on delivery.”

The hunch, as a team usually says it, before anyone opens the data.

Justin Jarvinen · Reviewed October 10, 2026

The short answer

Packaging is light, bulky, and low in value per cubic foot, so the cost to move it is high relative to what it sells for. When freight is assumed to be built into price, nobody checks whether it still is after fuel, carrier rates, and order patterns change. Match carrier and fleet costs to invoices by customer, lane, and order size, and divide what was billed for delivery by what it cost. The gap is usually largest on small, frequent orders and long lanes.

Where it hides in packaging distribution

Cube, not weight

Corrugated, foam, and void fill fill a trailer long before they reach its weight limit. Freight priced by weight or by order value under-recovers on bulky goods.

Free delivery thresholds set years ago

A threshold set when freight was cheaper now gives away delivery on orders that no longer cover it.

Drop-ships from manufacturers

Custom printed boxes ship direct from the converter, and the freight on the manufacturer’s invoice is not always passed through.

Long lanes priced like short ones

A customer two hundred miles from the warehouse may receive the same pricing as one around the corner.

The records to pull

Twelve to twenty-four months of each. Nothing needs to be installed or connected; a spreadsheet export is enough.

Carrier invoices and fleet costs

Shipment date, origin, destination, weight, cube or pallet count, and cost.

Invoice lines

Customer, ship-to, order value, any freight or delivery charge, ship method, and whether it was a drop-ship.

Freight policy

Free-freight thresholds, fuel surcharge rules, and any customer exceptions.

The ten-day test

Days 1–2

Write down the recovery rate the team believes it achieves. Hold out the last quarter.

Days 3–5

Allocate freight cost to invoices by cube where it exists, by pallet or weight where it does not, and compute recovery by customer, lane, and order size.

Days 6–8

Check every drop-ship for manufacturer freight that was paid and not billed.

Days 9–10

Confirm in the holdout and size three fixes: a cube-based delivery charge, a reset threshold, and drop-ship pass-through.

Specimen · illustrative figures

A $55M packaging distributor paid $3.9M to move goods and billed $2.2M, a 56 percent recovery rate. Drop-ships with unbilled manufacturer freight accounted for $310K. Orders under $400 carried 29 percent of freight cost. Passing through drop-ship freight and moving to a cube-based charge on small orders was worth an estimated $600K to $850K a year.

Stop condition, written first

Stop if recovery is above 90 percent overall and within ten points across lanes and order sizes, in both the search period and the holdout.

What gets built if it holds

A delivery charge calculated from cube and lane at quote time, plus an automatic pass-through of manufacturer freight on drop-ships. It runs inside your operation, belongs to you, and is measured weekly against the dollar range the test produced.

Sources

  1. 16National Association of Wholesaler-Distributors, “The Growing Impact of Freight Recovery,” Intelligent Sales and Profit Acceleration series, 2021, updated August 2026.

Specimen figures are illustrative and do not describe a Modven client. Reviewed October 10, 2026.

Questions

Asked often, answered plainly.

How do we allocate freight when one truck carries many orders?

Use cube if you have it, pallets if you don’t, and weight as a last resort. The aim is a consistent allocation, not a perfect one.

What recovery rate should a distributor target?

Your own best customers and lanes set the target. Industry research finds wide gaps between branches inside the same distributor, which shows the gap is usually policy rather than market16.

More from the hunch library

See every hunch →

Start here

Where do you suspect the value is hiding? Tell us your hunch. Ten days later it comes back with numbers on it.

10 business days · $500, credited against any build